15.12.2016
Construction of a cruise liner at Astrakhan shipyard “Lotos” is carried out according to the schedule.
Construction of a cruise liner at Astrakhan shipyard “Lotos” is carried out according to the schedule.
Late November “Lotos” shipyard (included into USC) concluded a Contract on supply of the rolled metal. High-quality material for construction of PV300VD cruise liner was manufactured at the enterprises of “Severstal” holding company.

14.12.2016
Finnish delegation visited the USC enterprises in Astrakhan.
Finnish delegation visited the USC enterprises in Astrakhan.
On December 13-14, as part of the Russian-Finnish business forum “Collaboration in the area of high technologies for development of shipbuilding and offshore production in the Astrakhan region”, the delegation headed by Mikko Hautala, an Ambassador of Finland to Russia, got acquainted with manufacturing facilities of the Astrakhan Shipbuilding Production Organization and Lotos shipyard.

01.11.2016
The President of Russia visited Astrakhan Shipbuilding Production Association (ASPO).
The President of Russia visited Astrakhan Shipbuilding Production Association (ASPO).
On October 31st Vladimir Putin observed the production cycle for Caspian field drilling platforms at the ASPO yard (a part of USC) and started oil production at Vladimir Filanovsky field.

19.10.2016
CNRG Projects now certified as compliant with the international quality standard requirements.
CNRG Projects now certified as compliant with the international quality standard requirements.
12 through 14 October 2016 the CNRG Projects (part of the United Shipbuilding Corporation (OSK) has successfully passed the scheduled due diligence by Quality management system (SMK) in order to confirm the validity of the certificate of SMK compliance with the requirements of ISO 9001:2008.